Planning permits for gyms and fitness studios

“Gym” is a broad term. It covers everything from 24-hour gyms to Pilates studios and high-intensity interval training (HIIT) facilities, and most need a planning permit before they open. Konrad Bruhn has assessed gym applications as a council planner and obtained permits for major 24/7 gym franchises, reformer Pilates studio chains and HIIT training chains.

When you need a permit

Councils typically characterise a gym as a “restricted recreation facility”, because a membership-based gym aligns with the planning scheme’s definition of that term. In most zones, including the commercial and industrial zones where most gyms open, that use needs a planning permit. That applies even when you make no changes to the building, such as moving into a shop, warehouse or factory unit last used for something else.

Planning schemes set no car parking rate for a restricted recreation facility, so parking must be provided to the satisfaction of the responsible authority, usually the council. That makes car parking a live issue in most gym applications.

Signs and external building works can need their own approval.

What council will look for

Car parking. With no set rate, council decides how many spaces are enough, usually from a parking demand assessment based on your class sizes, peak times and the parking nearby.

Noise. Music, amplified instruction and dropped weights, especially next to or below homes. Councils often ask for an acoustic report.

Hours and numbers. Permits usually set operating hours and a maximum number of patrons. 24-hour access and early-morning classes get the closest look.

Neighbours. Applications are often advertised, and neighbours can object.

How we help

  • Check the zone, overlays and any existing permit for the site, ideally before you sign a lease.
  • Advise whether you need a permit and what council is likely to raise.
  • Prepare and lodge the application, and coordinate traffic and acoustic reports where they’re needed.
  • Manage the application through council, including further information requests, advertising, objections and permit conditions.
  • Amend an existing permit for longer hours, more patrons or more floor area.
  • Respond to council compliance letters about a gym trading without a permit or outside its conditions.

Common questions

Do I need a planning permit to open a gym in Victoria?

Usually, yes. In most zones a permit is needed to use a building as a gym, even with no building works. It depends on the zone, any overlays and what the premises is already approved for, so check before you sign a lease.

How many car parking spaces does a gym need?

There is no set rate. The planning scheme leaves the number to council, and it is usually settled by a parking demand assessment covering class sizes, peak times and the parking available nearby.

Can a gym open 24 hours?

Yes, if the permit allows it. Council will look at noise and activity late at night and early in the morning, particularly near homes, and may limit classes or music at those times.

This page is general information only. Planning controls differ from site to site, so get advice on your property before you commit.